SZL Biomass Fired Boiler
Introduction
Model specification and Configuration Illustration
The instruction of Grate's configuration: choose different grate according to the quality of coal
The instruction of dust collector's configuration:choose different dust collector according to different environmental protection regulation
The instruction of slag remover configuration:choose different removers(spiral or scraper) according to the feature of fuel
The instruction of steam distributor's configuration:choose the number of tube socket of output and input according to the workshop's requirement
The instruction of water treatment device's configuration:choose water treatment device' according to the hardness of water
SZL Biomass Fired Boiler
SZL Biomass Fired Boiler
SZL Biomass Fired Boiler
Unique Orientation
The first choice of package boiler
SZL series products have adopted double-drum offset hearth(D type layout),Water-cooled arch and smoke three-pass process design. Back shack pipe and water-cooled arch form an independent cyclone reburning chamber, all for water tubes structure, fast pressurizing,high quality steam by adopting the new steam-water separator equipment. the ready-packaged boiler makes it convenient to install and transport. SZL series products are key recommendation products for China's energy conservation projects, which obtain the national scientific and technological process second prize and Singapore new product expo golden lion award.
Presentation of boiler body detail
Double-drum
Independent cyclone rebruning chamber
Presentation of boiler grate detail
Block and porous of grate bars
External oil cup design
The design of Independent Coal storage bucket
Features
Unique manufacturing technique and complete inspection process
1. High temperature annealing treatment of up and down head
2. Fully automated tube sheet welding
3. 1.4 times' hydro test
4. All-around crack detection in the pressure parts
5. Optimizing installation technique during 20 years' production
6. 24 hours operation debugging of grate
7. 60 lines inspection before delivery
8. Fully automated Precise technique of blanking
9. Experienced welding construction team
Technology
Unique Technical Expression
1. D type offset hearth
2. Independent cyclone reburning chamber
3. Large-sized down pipe
4. Independent self support
5. Y type arch
6. Grate type Steam and water separation device
7. Front and rear furnace door for watching fire
8. High density convection tubes on the furnace left side
9. Large heating surface
10. Blowing ash hole in the middle of the convection tube bundle
11. Oversized furnace
Grate technology features
1.Chain belt type grate stoker
2.Block porous grate bars
3.Multiple duct distribute wind design
4.Seals design at the two sides of grate
5.Stretched ash removing device
6.Overall pouring spillplate
7.New casting material for furnace arch
8.Integrated delivery
The Machine's Technical Features
1.Chain belt type grate stoker
2.The boiler is packaged well before leaving factory
3.Economizer configuration
4.Double safety valve configuration
5.Double water gauge configuration
6.Double pressure gauge configuration
7.Double providing water pump configuration
8.PLC intelligent control
9.Auxiliaries modularity design
Configuration Instructions
Instruction of the boiler's configuration:
Boiler Main Body
Boiler Main Body
Induced Fan
Induced Fan
Forced Fan
Forced Fan
Speed Reducer
Speed Reducer
Control Box
Control Box
Fuel Feeder
Fuel Feeder
Instruction of system configuration:
Ceramic Multi-tube Dust Collector
Ceramic Multi-tube Dust Collector
Composite Granite Water Film Dust Collector
Composite Granite Water Film Dust Collector
Chimney and Smoke Ducting
Chimney and Smoke Ducting
Economizer
Economizer
Slag Remover
Slag Remover
Softened  Water Device
Softened Water Device
Water distributor
Water distributor
Water Pump
Water Pump
Process of smoke flow:
Forced fan-air flue-grate-furnace-cyclone returning chamber-second pass-third pass-gas duct-Economizer-Ceramic multi-tube dust collector-Composite granite water film dust collector -Induced fan - chimney
Water flow Process:
Tap water-Softened water tank-supply water pump-boiler-steam distributor-workshop
Parameters
Model SZL2-1.6-T SZL4-1.25-T SZL4-1.6-T SZL6-1.25-T SZL6-1.6-T SZL8-1.6-T
Rated Evaporation Capacity(t/h) 2 4 4 6 6 8
Rated Working Pressure(MPa) 1.6 1.25 1.6 1.25 1.6 1.6
Saturated Steam Temperature(℃) 204 194 204 194 204 204
Boiler Water Capacity(m3) 6.76 5.1 5.1 8.4 8.4 9.4
Heating Surface(㎡) 65.12 126.5 126.5 164.32 164.32 205
Economizer heating surface(m2) 26.4 43.2 43.2 69.76 104.64 174.4
Grate Effective heating surface 2.9 4.6 4.6 7.23 7.23 8.9
Maximum shipping demension (mm) 5960x2700x3470 6510X3130X3462 6510X3130X3462 7830X3340X3462 7600X3500X3464 8870X3346X3464
Packaging and Shipping
The boiler is  packaged before leaving factory within1-10t/h
All packaged boiler can install quickly as long as all parts arrive the place,the arch poured already 
Our Services
Promises
1.Technology accumulation of 60 years,over ten thousands users,its life is up to 20 years
2.Pricise work, mature technology, cost-effective choice
3.We not only  provide devices,but also technology and service
4.We are a company with technology and soul,Good reputation is our secret weapon.
5.Our existence is to make our customer satisfied .
After-sales service
1 year guarantee,free maintenance within 1 year if there is quality problem.
User Site Recommended
Send Your Inquiry
Please feel free to submit your inquiry information to us. We will contact with you as soon as possible
Name:
Email:*
Phone:
Country:
Inquiry:*